Team Mildenhall completes first RC-135 hot-pit refueling
U.S. Air Force Airman 1st Class Jo’von Green, 100th Logistics Readiness Squadron fuels distribution operator, carries a fuel hose to a RC-135 Rivet Joint aircraft on the flightline at Royal Air Force Mildenhall, England, Aug. 14, 2023. Hot-pit refueling operations test an aircraft capability to land and park, keeping the engines running, while the aircraft is refueled and prepared to take off quickly. (U.S. Air Force photo by Airman 1st Class Christopher Campbell)
PHOTO BY:
Airman 1st Class Christopher Campbell
VIRIN:
230814-F-XA271-1142.JPG
FULL SIZE:
3.69 MB
CAMERA
NIKON Z 6_2
LENS
NIKKOR Z 70-200mm f/2.8 VR S
APERTURE
63/10
SHUTTERSPEED
1/200
ISO
125
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.